Full Connectivity, Borderless Empowerment - Sungrow Unveils iNexGrid All-Scenario Microgrid Solution at Intersolar Europe 2026

26.06.2026

MUNICH, June 26, 2026 /PRNewswire/ -- Sungrow, the globally leading PV inverter and energy storage system provider, released iNexGrid all-scenario microgrid solution at Intersolar Europe 2026. The solution shows an innovative Five-Layer System Protection that delivers superior reliability, full-lifecycle economic benefits and deep decarbonization to high-demand microgrid scenarios including mining, AIDC, commercial & industrial (C&I) and island power supply.

Sungrow showcases iNexGrid All-Scenario Microgrid solution at Intersolar Europe 2026

One Core, Multi-Energy & Full Connectivity

Microgrids have become mainstream infrastructure for enhancing energy security and advancing carbon neutrality goal. However, different application scenarios face distinct challenges in reliability and cost-efficiency: Mining microgrids struggle with source-grid-load coordination under high volatility; AIDC microgrids must balance millisecond-level power surges with stringent power quality requirements; C&I microgrids face large loads, peak-to-valley fluctuations, and high demand charges that erode profitability; and off-grid island microgrids remain heavily dependent on diesel generation in harsh and corrosive environments.

"Across different application scenarios, customers are looking for the same core outcomes: stable operation, stronger lifecycle profitability, and intelligent capabilities that support future growth," said Luyao Shi, Product Director of Sungrow Smart Energy. "Built on Sungrow's full-stack in-house technologies, our Five-Layer System Protection is designed to support stable and reliable microgrid operation."

Five-Layer System Protection & Ultimate Stability

Integrating Sungrow's inhouse PV, wind, energy storage, EV charging and cloud platforms, the iNexGrid microgrid adopts PowerTitan 3.0 grid-forming storage and Nexus-M100 microgrid controller to build a full-cycle five-tier protection matrix tailored for different microgrid scenarios.

  • Steady State: Proactive Protection

    Steady-state proactive protection leverages AI wind-solar and load forecasting to slash power deficits by 80%+, lift prediction accuracy by 10% and shorten project payback by 1-2 years by edge-cloud hybrid and Transformer-GNN algorithms.
  • Small Disturbance: Millisecond-Level Local Support

    Virtual excitation control, flexible inertia support and fault ride-through technology deliver instant millisecond response, suppressing voltage flicker and minor power fluctuations that pose risks to sensitive AIDC server equipment.
  • Large Disturbance: Hundred-Millisecond-Level Coordinated Control

    Under the strategy of "Regulation Instead of Shedding", the seamless on/off-grid switching and off-grid secondary frequency and voltage regulation technology can sustain key loads such as mine ventilation and AIDC data storage facilities.
  • Major Fault: Second-Level Emergency Control

    Coordinated multi-voltage-source control between diesel and ESS paired with automatic fault disconnection, the system can have second-level emergency control when facing Major Fault.
  • Grid Fault Collapse: Minute-Level Grid Self-Healing

    Even amid grid fault collapse, the large-scale black start technology enables GW-scale plant to restore full microgrid power supply within 1 minute.

Customized Solutions for N+ Core Scenarios

Built on the iNexGrid Five-Layer System Protection, Sungrow delivers tailored solutions for diverse microgrid scenarios.

  • For mining microgrids, the "Regulation Instead of Shedding" strategy enables the Nexus-M100 controller to dynamically adjust storage and diesel output, lifting power reliability to 99.99% and preventing costly production shutdowns.

 

SUNGROW Mining Microgrid Solution Topology

 

  • For AIDC microgrids, frequency-decomposed power control combined with grid-forming storage effectively smooths power swings, limiting voltage and frequency deviations within ±2% to prevent server downtime and data loss.

 

SUNGROW AIDC Microgrid Solution Topology

 

  • For C&I microgrids, AI-driven Optimal Dispatch helps reduce peak electricity fees to raise comprehensive returns by 12%, while a hierarchical collaborative architecture enables millisecond-level joint control across all assets.

 

SUNGROW C&I Microgrid Solution Topology

 

Proven Global Track Record & Streamlined Delivery Capacity

Sungrow has delivered microgrid projects globally, including those for Naipu Mining Machinery in Zambia and the HyIron Oshivela project in Namibia. This success is supported by the company's total installed capacity exceeding 1,000 GW worldwide.

Besides, iSolarDesign improves design efficiency by over 99% via 8,760-hour full-sequence simulation and optimization covering 10,000+ scenarios. GW-scale simulation effectively enhances system stability, while prefabricated delivery shortens installation and enables operation up to 17 days earlier. The iCarbon platform supports smart carbon management, driving efficient full-chain carbon accounting across microgrids and predictive O&M to enhance full-cycle system performance.

"The name iNexGrid embodies our vision: future microgrids will no longer be isolated systems tailored for a single scenario, but universal, intelligent, and continuously evolving smart microgrid hubs," Luyao Shi concluded. "Sungrow will continue to deepen the integration of AI technologies with microgrids, making microgrid solutions more intelligent, scalable, and easier to deploy, while contributing to the global energy transition."

Logo

Photo - https://mma.prnewswire.com/media/3000914/image1.jpg

Photo - https://mma.prnewswire.com/media/3000911/image2.jpg

Photo - https://mma.prnewswire.com/media/3000913/image3.jpg

Photo - https://mma.prnewswire.com/media/3000912/image4.jpg

Logo - https://mma.prnewswire.com/media/1344575/Logo.jpg

 

Cision View original content:https://www.prnewswire.co.uk/news-releases/full-connectivity-borderless-empowerment---sungrow-unveils-inexgrid-all-scenario-microgrid-solution-at-intersolar-europe-2026-302811478.html

Other news

Purpurfarbene Busse statt Züge: Deutsche Bahn modernisiert Ostbayerns zentrale Magistrale

15.06.2026

Auf einer der wichtigsten Bahnachsen Ostbayerns ruht für ein halbes Jahr der reguläre Zugverkehr. Die DB InfraGO hat die Korridorsanierung der Strecke Obertraubling–Passau gestartet und die Verbindung weitgehend voll gesperrt. Von diesem Sonntag an bis zum Fahrplanwechsel am 12. Dezember wird die Infrastruktur auf rund 120 Kilometern umfassend erneuert. Das Investitionsvolumen liegt nach Bahnangaben bei rund 1,3 Milliarden Euro inklusive Risikopuffer.

Die Arbeiten schließen unmittelbar an die seit Anfang Februar laufende Generalsanierung der stark befahrenen Strecke Nürnberg–Regensburg an, die bis 10. Juli abgeschlossen sein soll. Auf dem Abschnitt bis Passau erneuert die Bahn Gleise, mehr als 140 Weichen und etwa 90 Kilometer Oberleitungen. Mehrere Stellwerke werden ersetzt oder instand gesetzt, veraltete Relais‑Technik weicht moderner Elektronik. Hinzu kommen eine Eisenbahnüberführung und fünf Personenunterführungen; im Bereich Osterhofen muss an einer Moorstelle nahe der Donau der Untergrund aufwendig verfestigt werden. Acht Bahnhöfe werden modernisiert und mit höheren Bahnsteigen schrittweise barrierefrei ausgebaut – Arbeiten, die bis ins Frühjahr 2027 hineinreichen.

Für Reisende hat die Sanierung gravierende Folgen. Im Nahverkehr richtet die Bahn zusammen mit der Bayerischen Eisenbahngesellschaft ein dichtes Netz an Schienenersatzverkehr ein. Rund 90 Busse sind auf sechs Linien unterwegs; sie und die Wegweiser sind in auffälligem Purpur gestaltet, um die Orientierung zu erleichtern. Im Fernverkehr entfallen die Züge zwischen Nürnberg beziehungsweise Regensburg und Passau sowie weiter nach Wien komplett. Fahrgäste Richtung Österreich werden auf Verbindungen über München verwiesen, zusätzliche Züge über Mühldorf und Salzburg sowie ein Ersatzbusangebot für Passauer Fernreisende sollen die Auswirkungen abfedern.

Aus der Politik kommt grundsätzliche Unterstützung, zugleich aber auch der Hinweis auf die Belastungen für Region und Wirtschaft. Der Parlamentarische Staatssekretär Ulrich Lange betonte, wer eine leistungsfähige, verlässliche Bahn wolle, müsse jetzt entschlossen modernisieren; am Ende profitierten Fahrgäste und Wirtschaftsstandort. Bayerns Verkehrsminister Christian Bernreiter sprach mit Blick auf den kurzen Abstand zur Baustelle Nürnberg–Regensburg von einer zweiten großen Belastung binnen kürzester Zeit für Fahrgäste und Unternehmen in Ostbayern. Für die Bahn ist der Korridor zwischen Regensburg und Passau zugleich Testfeld für die Strategie, ganze Streckenabschnitte in gebündelten Sperrpausen grundlegend zu erneuern, um langfristig die Pünktlichkeit zu verbessern.